Nuagaon Iron Ore Project

Machinery and equipment
  • Year: 2016
  • Method: Sea Freight
  • Port of loading: Townsville, Australia
  • Port of discharge: Paradip Port, India

MMG mining is one of the largest corporations in the industry. They have sites around the world and contacted Accord in late 2016 needing to ship machinery and equipment from their site in Townsville, Australia to Paradip Port,India.

The project was so large that Accord Logistics had to charter a whole vessel to move the shipment – which included excavators weighing in at 3,075.55 MT each.  The project ran impeccably with the machines leaving Townsville in January 2017 and were successfully discharged in Paradip port in India in August 2017